Use this pre-site checklist to assess and document construction site readiness before work begins. Review design details and utilities on plan, confirm electricity and water locations, assess site fall and driveway obstructions, and verify survey pegs. Check access, temporary fencing, grass slashing and rubbish removal needs, retaining walls and immediate backfill. Record conditions and council asset damage, crossovers, and adjoining property fencing and status. Capture services (power, water, sewer, stormwater, telecom, gas) and other concerns. Include site plan photos and complete a fire ant inspection.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
