This Construction QA Close Up checklist supports interior fit-out quality assurance before close-up and handover. It guides teams to confirm the latest drawings and specifications are used, M&E handovers are completed, and all works meet project requirements. Checks include insulation installation, VCL overlaps and seals, correct plasterboard type, screw spacing, adhesive dabs, square and plumb corners and reveals, fire tape/jointing, and ceiling grid setout and board type. It also prompts site clearance, photographic evidence, and signature capture for both contractor and main contractor to document compliance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
