This quality assurance checklist supports drywall tape and jointing work on construction sites. It covers pre start handover, site cleanliness and protection, board condition and dryness, correct fixings and secure boards, square and plumb corners, and adequate ambient temperature and lighting. It verifies taping and jointing to specification, including paper tape use and multi layer compound application feathered beyond each pass, and confirms finished surfaces meet a 3 mm tolerance. Final steps include cleaning floors, removing materials and waste, and sign off to prepare the area for following trades.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
