This PSS-01 BRM Pre Site Survey checklist supports planning during the pre construction phase under CDM 2015. Capture project and location details, personnel present, and local authority information. Assess foreseeable hazards including traffic management, footway or lane closures, overhead and underground utilities, and proximity to rail or waterways. Record environmental constraints such as conservation areas, listed buildings, SSSI, and tree preservation, plus required consents. Plan permits, welfare and emergency arrangements, and any site specific rules. Request utility STATS and CPP information, schedule Cat and Genny surveys and trial holes, define unloading areas, materials storage, and access, and outline shoring, lifting, edge protection, signs and barriers, and containment of spoil. Export to PDF and share with the WSO and Streetworks team per BRM process.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
