Use this pipework visual inspection checklist to conduct weekly plant checks on building mechanical systems. Verify supports, spacing, routing against drawings, pipe sizes and materials, sound joints and welds, allowance for expansion, and correct venting and draining. Confirm sleeves and fire stopping are fitted, paint is complete, isolating and commissioning valves are installed per specification, and strainers and flexible connections are in place. Check fan coil unit connections and overall insulation quality. Add notes and photos where issues are found and capture site manager sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
