Skip to content
SafetyCulture
Template

Temporary Works Permit: Alter, Load, Unload, Strike

by Werner De Klerk, from the Community

0
Get this template

This permit template is designed for managing temporary works on construction sites when altering designs, loading and unloading, or striking. It guides supervisors and coordinators through key checks including RAMS references, applicable drawings and method statements, back propping requirements and duration, and defined start and finish times. Capture names, roles, and signatures for contractor supervisors and the Temporary Works Coordinator, record permit numbers and dates, and ensure clear authorization, control measures, and compliance throughout the activity.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.