This process control form guides the cut and seal stage of post-tensioned slab works. Verify engineer or main contractor approval of stressing records, prepare for grouting, cut strands to achieve required cover, and seal stressing pockets with a dry pack mix including Masonry AU1. Confirm ducts are clear with free airflow and address any blockages. Record intermediate points, tendons, and notes. Includes sign-off fields for the main contractor and the leading hand.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.