This Inspection and Test Plan template helps contractors document and verify post-tensioning grouting of slabs. It covers pre-grouting checks, grout mix details (premix or GP cement with additives), required water-to-cement ratios per product data sheets, and the grouting procedure for different duct types (flat 70 or 90 mm or round). Record inspections for looped tendons, grout expulsion quality, perimeter leak checks, and completion status. Capture results and any required follow-ups, and obtain confirmations from the pump, bucket and nozzle operators, the leading hand, and the main contractor to ensure compliant, fully grouted tendons.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.