PT Slab Pre-Pour Inspection Checklist PCF-100
by Cassandra Cook, from the Community
Use this process control form to complete a pre-pour inspection for post-tensioned concrete slabs. Confirm anchorages and tendon counts, positioning, and profiles per drawings; check ducting, grout hoses, and sealed joints; verify sufficient jacking length; observe anti-burst reinforcement; and ensure builder engineer reports are received and all items closed out. Capture comments for any nonconformances and record signatures from the main contractor and leading hand before concrete is poured.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.