Skip to content
SafetyCulture
Template

Marchetti Constructions Post Job Report

by Luke Marchetti, from the Community

Downloads: 0

Use this post job report checklist by Marchetti Constructions to capture essential handover details after frame or build completion. Record site, date, preparer and supervisor, frame and build types, crew responsible, and photo evidence. Verify material quantities and quality, floor and hardware conditions, site tidiness, and gate security. Check walls and bulkheads for level, confirm void alignments, and ensure the job is ready for inspection. Designed for construction supervisors to standardize closeout documentation and streamline quality assurance.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.