Use this Interflow civil works identification audit to plan and document sewer excavation activities. Record works package, line number, pipe diameter, and flow rate. Capture upstream and downstream manhole numbers and gas levels. Specify the reason for works such as buried or damaged manholes, displaced junctions, droppers, mains spot repairs, or un-interfitable connections. Mark out the dig using camera reel, sonde, or trundle wheel, and note who marked it. Log excavation address, resident contact details, location and surface material, reinstatement needs, access, obstructions, traffic management, depths and lengths. Add photos and complete sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .