This Painting QAQC checklist supports brush and roll applications on construction sites. It guides inspectors to confirm updated drawings and approvals, verify taping quality and any required level 5 finishes, and ensure MEP work is completed before final coats. Items include sanding and spot priming of drywall patches, correct base and ceiling heights, adequate lighting, and readiness for any specialty finishes. It checks for damage-free walls, uniform finish, a pre punch-list walk, cleanup of materials, and a joint walkthrough with the general contractor. The process concludes with comments and formal sign off by the QAQC inspector.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
