Skip to content
SafetyCulture
Template

ICS Roofing Composite Panels Handover Form

by Lucian Galan, from the Community

Downloads: 0

Use this ICS Roofing handover checklist to complete and document final checks for composite panel roofing installations. Record project and site details, confirm panel supports and steels, verify tapes and sealants, ensure panels are aligned and level, and check fixings at the correct centres per ICS CI drawings. Review flashings for alignment, and confirm walls are clean and damage free. Capture inspection names, signatures, and dates for both ICS Roofing Ltd and the main contractor to formalise handover and close out.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

ICS Roofing Composite Panels Handover Form Checklist | Free Template