ICS Composite Panels Quality Assurance Checklist
by Lucian Galan, from the Community
This ICS checklist supports quality assurance for Eurobond composite panels during construction. It guides installers through pre-install checks and installation verification, including steelwork tolerances, structural fixings, primary seals, and continuous rubber air seals. It covers panel condition, joint alignment, removal of protective film, and correct packing of gaps with rockwool or fire-rated foam. Flashings and secondary seals are detailed, with requirements for drip cover flashings, butt straps, butyl tape application, and fastener types. The workflow includes adding notes, photos, and actions, with installer, ICS, and client sign-offs to complete QA documentation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
