This construction handover checklist is designed for composite panel installations on walls and roofs. It guides final quality checks on panel support and steel, correct tapes and sealants, panel line and level, fixings to specified centres per ICS CI drawings, flashing alignment, and overall cleanliness. The form captures project details (client, contract number, building/area, site, preparer, location) and includes sign-off sections for the installer (ICS Roofing Ltd) and the main contractor with names, signatures, and dates.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
