This SF13 pre street-inspection defect form helps civil and roadworks teams document site conditions before work begins or handover. Capture supervisor name, location and street, build area, starting and finishing points, and total distance. Select surface type (tarmac, verge, flags, block paving, concrete) and attach photos covering the full area. Note defect counts and condition details such as damage to flags or tarmac. Extend reporting with optional parts 2 and 3 if the area is large. Conclude by confirming that all relevant information has been added for a complete, auditable record.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
