Skip to content
SafetyCulture
Template

Handover for New Projects

by George Basdekis, from the Community

Downloads: 10+

This construction project handover checklist helps verify life safety and code compliance before commissioning new builds. It covers detailed inspections across fire protection and life safety systems, including clean agent systems, elevator shaft pressurization, emergency lighting and exit signage, fire alarm systems, fire pumps, foam-water sprinkler systems, NFPA 13 sprinklers, kitchen hood suppression, private water and hydrant networks, smokeproof enclosures, and high-rise requirements. It outlines operational tests, hydrostatic and flow tests, documentation and certifications, and integrated system commissioning to ensure readiness and regulatory compliance.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.