This connection checklist supports steel erection teams in the field. Inspect connections along each column line and confirm a minimum of two bolts per connection. Capture jobsite name and number, date, and the preparer, then record dates and signatures for each section to document compliance and workmanship. Use this template to standardize quality checks, improve safety, and provide traceable records for structural steel installation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
