This steel erection quality control checklist helps construction teams inspect structural steel installation against drawings and site requirements. Use it to confirm anchor bolt positions, erection sequencing, temporary bracing, bolted and welded connections, cladding rails, roof purlins, alignment and level, grouting, and paint touch ups. Capture sign offs from contractor, client, and subcontractor.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
