Concrete Batch Unit Commissioning Checklist
by Dallas Ellsworth, from the Community
Ensure safe, compliant startup of concrete batch units with this electrical commissioning checklist. Verify motor rotations, overload settings, E-Stop function, Rice Lake control panel operation, horn audibility, service receptacles, scale cabling and load cells, compressor cut-in and cut-out pressures, water meter settings, and HMCP and FLA values for augers, conveyors, pumps, and optional hydraulic systems. Capture photos, job numbers, and signatures to document completion.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.