Skip to content
SafetyCulture
Template

PERMAROCK Render Installation Checklist

by Jonathon Young, from the Community

Downloads: 0

This PERMAROCK render installation checklist supports site QA for cladding and external wall systems. It guides teams through removing existing cladding, fitting Rockwool Flex Slab with no gaps, and installing Y-Wall boards per manufacturer instructions. It covers joint sealing with fire mastic, DAFA tape, and primer, EPDM window sealing, and proper setting out and staggering of insulation boards. It details basecoat application with 45-degree stress patches at window corners, embedding mesh, leveling, priming, and applying the topcoat. The template enables photo capture, notes, corrective actions with assignees, priorities and due dates, plus digital signatures for installer, contractor, and client. Use it to keep areas clean and tidy and to produce shareable reports in PDF, Word, Excel, or web link formats.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.