Skip to content
SafetyCulture
Template

Quality & Workmanship Checklist – SAS System 200

by Alex Rus, from the Community

Downloads: 0

This BPC Interiors quality and workmanship checklist supports the installation of SAS System 200 metal ceilings. It covers pre-commencement readiness, hanger and EMAC primary channel setup, second fix C profiles and noggins, gaskets and perimeter details, and close-up with panel insulation and torsion springs. It includes safety cable requirements, bracing where needed, and benchmark standards. Use it to record inspections, coordinate handovers, and verify snag resolution for a compliant, client-accepted finish.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.