A practical quality and workmanship checklist for SAS System bespoke ceiling installations, aligned to BPC Interiors QWC 006 Rev 01. Use it across the project lifecycle to confirm specifications are final, RFIs closed, areas clear, and materials loaded out and stored dry. Verify hangers, transition trims, C profiles, ceiling panels, and insulation pads. Confirm setting out with gridlines and datums, coordinate M and E sequencing, and verify void handover. Check that approved layout drawings and dated trade handovers have been issued. On completion, ensure protection of works, conduct snag and de snag, clear all issues, and secure client acceptance and sign off for handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
