This shaftwall quality workmanship checklist guides site teams through critical stages of interior partition construction. It covers pre-commencement readiness, first fix framework setup, and door assemblies for medium and heavy duty openings. Core board installation steps address fire integrity, deflection heads, retaining channels, and tolerances. Pre second fix and service checks confirm insulation and containment readiness. Second fix boarding ensures correct screw spacing, joint staggering, and fire stopping. Beads, trims, and skirting checks verify alignment and finish quality. Tape and joint procedures outline drying times, sanding, and primer needs. The final section supports snagging, protection, and documented handover acceptance.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.