Skip to content
SafetyCulture
Template

Astech Holdpoint Asbestos Removal Checklist

by Paul maidment, from the Community

0
Get this template

This Astech Holdpoint checklist supports licensed asbestos removal by verifying readiness at critical hold points before works proceed. It covers plan of work quality and alignment to site conditions, staff and contractor briefings, access to required certifications, DCU setup and testing, access and egress routes, mandatory warning signage and barrier controls, equipment setup and checks, scaffold tagging, gas and electrical isolations, RPE checks and clean-shaven compliance, PPE use, daily inspection completion, enclosure smoke testing and certification, waste skip setup, vision panels or CCTV, flap deflections, NPU flow and pascal readings, and final approval to continue.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.