Skip to content
SafetyCulture
Template

Concrete Pumping Safety Take 5 Pre-Start Checklist

by Ben Roberts, from the Community

Downloads: 0

This pre-start Take 5 checklist helps concrete pump operators and contractors verify site readiness and safety before work begins. It covers required PPE, worker competence and SWMS sign-on, exclusion zones to prevent crush hazards, clear communications with agi truck drivers, checks for underground services and public safety, operational warning devices, stable outrigger setup, and overhead powerline hazards. It includes prestart equipment checks, agreed washout and excess concrete areas, and contractor sign-off.

With SafetyCulture you can

Digitize team workflows

Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.

Reduce manual errors

Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.

Create and share inspection reports

Generate inspection reports and share them with your team and stakeholders to keep everyone informed.

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.