This Take 5 pre-start checklist helps concrete pumping crews prepare for safe operations on site. Verify required PPE, confirm team competence and SWMS sign-on, and establish exclusion zones and clear communications. Inspect outrigger locations and ground conditions, check for overhead power and other hazards, and complete all pump prestart checks including connections, safety clips, hopper cover and emergency stop access. Agree on excess concrete and washout areas, then capture contractor sign off before commencing work.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.