Skip to content
SafetyCulture
Template

Pumping Safety Take 5 Pre-Start Checklist

by Ben Roberts, from the Community

Downloads: 20+
Get this template

This Take 5 pre-start checklist helps concrete pumping crews prepare for safe operations on site. Verify required PPE, confirm team competence and SWMS sign-on, and establish exclusion zones and clear communications. Inspect outrigger locations and ground conditions, check for overhead power and other hazards, and complete all pump prestart checks including connections, safety clips, hopper cover and emergency stop access. Agree on excess concrete and washout areas, then capture contractor sign off before commencing work.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.