This quarterly preventive maintenance checklist guides technicians through safe, consistent servicing of KOEI bollard control units. It includes required tools and materials, key safety warnings around high-voltage UPS cabinets, and step-by-step procedures: visual inspection for heat damage or loose components, battery and connection checks for leaks or corrosion, cleaning air intakes and replacing filters, replacing indicator lamps, spot cleaning and touch-up paint, and an operational test that simulates power failure to verify correct response and no alarm conditions. Results are recorded in the equipment log, along with total maintenance hours and work order details.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
