Use this new truck quality assurance checklist to complete pre delivery verification for heavy vehicles. Select make and model such as Volvo, Mack, or UD and capture chassis and customer details. Confirm park brake safety, torque turntable bolts, wire and test sensor turntable, and complete all required programming and campaigns with relays marked. Check aero kit installation location, remove any temporary battery bridge after PD, verify window tint, and record mod plate details with photos. Document photos of all work and four sides of the vehicle, note any damage, rust or swarf, remove rubbish, and check for active fault codes. Finish with QA sign off and build sheet confirmation before releasing the truck.
With SafetyCulture you can
Digitize team workflows
Turn your workflows into digital templates or checklists so your team can conduct inspections efficiently and access them from any device.
Reduce manual errors
Help your team complete tasks more accurately with digital templates that minimize errors from manual processes.
Create and share inspection reports
Generate inspection reports and share them with your team and stakeholders to keep everyone informed.
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
