Use this mobile VMS deployment and removal checklist to ensure safe, compliant setup and retrieval of trailer mounted variable message signs. Record project details, delivery or collection, operative, fleet number, and location. Capture photos on install and removal. Confirm stable, even site surface, lower or raise jacks to bear weight, and position solar panels correctly. Perform a communications check via Jamlogic, remove waste and materials, add comments, and complete operative sign off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions .
