UFB Connect MDU/ROW Checklist 5.1 (CV Edit)
by Michael Kingon, from the Community
Use this field-ready checklist to manage UFB Connect works for multi-dwelling units and right-of-way builds. Record site details, scope and excavation types, hardware installed such as BUDI, IFDB, and RAT, CVLS testing, and comprehensive photo evidence from pre-start to reinstatement. Track meters and surfaces, verify labeling and quality, and confirm provisioning readiness with sign-off.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
