This UFB Connect checklist supports field technicians and contractors handling faulty network repairs and billing. Capture site and service order details, confirm troubleshooting per ND0563, and identify the originating terminal or enclosure. Select repair categories across sections 4.2.1 to 4.2.7 including legacy duct and FFP repairs, blocked microducts, damaged FAT or ABFAT, lateral or drop off repositioning or installation, feeder fibre faults, splitter replacement, and PON issues. Attach before, fault, and repair photos, record plan usage, and document reinstatement status. Enter FO1 to FO3 fault codes, break down technician hours for testing, excavation, repair, reinstatement and quality tasks, and list materials and costs to produce accurate network billing.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
