Skip to content
SafetyCulture
Template

SCADS Commissioning Test v1

by Edward Hu, from the Community

Downloads: 10+
Get this template

This SCADS commissioning checklist helps telecom engineers document project details and verify voice and fiber links. Capture line system and multiplexed bearer codes, EU and RU locations, and tester information. Record POTS channel checks (1–30) and ISDN 100V channel results (1–12). Measure and log laser output power, received levels, and optical margin tests across EU–RU hops (EU–RU1 through RU5–RU6). Use the comments section to note anomalies and corrective actions. Designed to standardize telecom network commissioning and ensure reliable service activation.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.