Use this SAT witness testing checklist to conduct thorough site acceptance verification for telecom and data center installations. The template covers cabin rooms, door operations, emergency and external lighting, labeling, cable containment, Roxtec glands, and rack security. Validate fire and intruder systems, VESDA commissioning, AC units and temperature control, UPS configurations and batteries, DC and AC distribution boards, and generator function with on load and off load tests. Include CCTV checks, keybox access, alarms inputs and outputs tests, documentation to BS7671 2018, and comprehensive health and safety checks. Record snags, assign actions, capture evidence, and sign off with engineer details.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.