Skip to content
SafetyCulture
Template

Travis Perkins Wi-Fi Installation Sign-Off Form

by Mike John, from the Community

Downloads: 10+
Get this template

This digital sign-off template is used by Elecomm engineers at Travis Perkins sites to confirm completion of Wi-Fi installations. It captures job and store numbers, travel and on-site times, scope of works, and attending engineers. Technicians record BT Business Hub installation and serials, power injector status, and access point details including serial, MAC and IP, with supporting photos. A speed test can be run with a screenshot. It also tracks the number of TC55 devices and configuration status, issues found with photos, and issue resolution evidence. The form concludes with comments, lead engineer details, and client sign-off, acknowledging the wireless coverage has been tested and accepted.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

Travis Perkins Wi-Fi Install Sign-Off Checklist | Elecomm | Free Template