Use this checklist to guide 4TH Utility customer premises equipment CPE installations from start to finish. Record job details including flat or plot and project or block, note the installation date and preparer, confirm the CPE location and adequate light levels, and capture photos for evidence. Log the CPE serial number, photograph the serial and the installed router as left on site, and add any extra notes needed for handover. Finish with an engineer signature to confirm completion and quality of work.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
