This practical checklist guides field staff and clients through distributing and confirming posters at site. Record the job reference and station, capture GPS location, and describe the poster to be fitted. Confirm the frame location and reference, note frame condition, and take before and after photos. An engineer confirms installation and any actions taken, while the client provides independent confirmation. Log date and time of completion and any comments, then send the completed report to the designated recipient as required.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
