Use this checklist to manage Phase 3 self checkout cabling works in Lidl stores. Capture store and site details, engineer name, location, installation date and time. Record the number of new cables installed and note switch port availability. Attach photo evidence before and after, including the data cabinet, patched cables, and cables coiled on tray ready for the second night. Add installation notes, confirm scope, collect engineer and Lidl representative signatures, and log time leaving site. Designed to support consistent, safe, and well documented retail IT installations.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
