Skip to content
SafetyCulture
Template

Lidl SCO Phase 3 Cabling Works Checklist

by Mark Robinson, from the Community

0
Get this template

Use this checklist to manage Phase 3 self checkout cabling works in Lidl stores. Capture store and site details, engineer name, location, installation date and time. Record the number of new cables installed and note switch port availability. Attach photo evidence before and after, including the data cabinet, patched cables, and cables coiled on tray ready for the second night. Add installation notes, confirm scope, collect engineer and Lidl representative signatures, and log time leaving site. Designed to support consistent, safe, and well documented retail IT installations.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.