Skip to content
SafetyCulture
Template

Lidl Data Cabling Installation Phase 1 Signoff

by Niall Rhodes, from the Community

0
Get this template

This installation signoff checklist supports Lidl XXL Phase 1 data cabling works. Teams can capture pre- and post-install photos of cabinets and containment, record LAN and WAN switch details and serial numbers, verify rack labeling front and back, document cable routes and penetrations, and confirm grommet IP rating, fan unit power and temperature settings, and neat switch cabling. The form concludes with installation sign-off, store contact, lead engineer confirmation, and finish date for quality assurance and handover.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.