This Aramark Seamless Surveys template for Q2 2019 helps teams assess retail store readiness for power and data installations. Capture facility details, health and safety requirements, permits, potential asbestos concerns, and security access needs. Document IT cabinet photos, patch panel capacity, cable types, and power distribution board specifications including required MCBs or RCBOs. Record socket and data outlet status, containment suitability, access equipment, floor plans, and location-specific requirements with distances to the distribution board and IT cabinet. Attach photos, note issues, propose alternatives, and finalize with sign-off by the store representative and auditor.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
