This Costa Coffee DMB (Digital Menu Board) Survey template helps project teams and contractors assess store conditions before installing barista and shopfront menu boards. Capture opening times, access and parking details, power and distribution board information, comms cabinet proximity, spare capacity, cable routing paths and lengths, hazards, and any restrictions. Document wall, ceiling and floor construction, ceiling heights, required access equipment, and materials such as conduit, connectors and sockets. Attach clear photos of entrances, existing menu board locations, power sources, and data ports to streamline installation planning and reduce on-site risks.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
