This daily checklist supports safe, clean operation of a Toning Centre before opening. Inspect CV equipment for power, active screens, functioning emergency stops, and intact cables and belts. Complete cleaning with a non-abrasive cloth and anti-bacterial cleaner: wipe frames, consoles, upholstery, and stretch mats. Cover all stations, including Chest & Legs, Waist Away, Seated Climber, Bums & Tums, Fly & Thigh, Hipster, Posture Pullover, Side Bend Stepper, Tummy Crunch, and V Plate. All checks must be completed and signed off by 07:45 AM before the centre opens to the public.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
