Underground Pump Station Piping Inspection (4-Week)
by Nyamjav Terbish, from the Community
This step-by-step SWI guides a 4-week visual inspection of underground pump station piping, focusing on valves, flanges, connections, and check valves. It covers pre-start preparations and C1 isolation, required tools and PPE, and key safety controls for electricity, slips, trips and falls, visibility, force, and communication. Inspect for leaks, damage, corrosion, and loose bolts, then complete housekeeping, return parts and tools, record repairs, and notify supervision when the system is back in operation.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.