This commissioning checklist guides technicians through configuring and validating Newtrax MRU installations on mining vehicles. Capture site and vehicle details, select primary and auxiliary kits, and record analogue inputs A1 to A8. Confirm payload installation, calibration, and display location, log inputs 1 to 4, and record the MRU serial number. Verify configuration and network connectivity, power, and placement of WiFi and GPS antennas. Check CAN 1, CAN 2 or IDN, and CAN 3 connections using a MET analyzer.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.