Grosvenor Instrument Installation Inspection
by Bruce R. Johnston, from the Community
This field inspection template supports instrument installation checks for mining operations at Grosvenor. Verify tag numbers and IP66 ratings; confirm labels, mounting positions (1500mm ±300mm), and walkway visibility; check junction box terminations, earthing and equipotential bonding, and capillary tubing protection. Capture locations (ROM, conveyors, stockpiles), attendees, punchlist items, inspections, and sign-offs from delivery through final handover.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
