Skip to content
SafetyCulture
Template

BWM Drill Bench Acceptance Checklist

by Shay Lyall, from the Community

0
Get this template

This BWM Drill Bench Acceptance checklist helps mining teams verify a bench is ready for drilling and blasting. It covers pre-work requirements such as drill prep maps, survey files or KML, and the 72-hour handover. Field checks include remaining earthworks, bund heights and limits, standoff bunding under walls or terraces, access suitability for service carts and blasting equipment, steep sections and possible terracing, and bench drainage. It also reviews pumping or pipework on the bench, cables and crossovers or towers, float move access, and geotechnical hazards with recommended controls. Separation bunding, cross fall and slope, grading, and free-draining conditions are assessed. Final section includes partial or full sign-off and confirmations that the bench meets drill agreement criteria, with sign-offs by the Drill Supervisor, Operations Supervisor, and Blasting Supervisor.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.

BWM Drill Bench Acceptance Checklist | Mining Safety | Free Template