Skip to content
SafetyCulture
Template

SMC Door Installation Checklist (VF213)

by Vanja Fowler, from the Community

0
Get this template

This VF213 SMC Door Installation Checklist guides bus assembly teams through critical checks for accurate, safe door installation. Verify door aperture height and width, squareness, and base plate position and level. Inspect pivot plates, shafts, and guide components; ensure Loctite 262 is applied to fasteners. Align door leafs to aperture seals and vehicle profile, set anti‑rattle guides and rollers, and confirm sensitive edge clearance. Test pneumatic operation and leakage, and set pressures to 600 kPa main and 250 kPa low pressure. Validate smooth opening/closing, proper cushioning, cylinder speed, alarm/brake response on sensitive edge activation, and emergency button function.

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

With SafetyCulture you can

Digitize any process, procedure or policy
Eliminate mistakes made by paper-based processes
Create and share professional reports instantly
Confirm accountability and compliance with a digital log

About author

This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.