Tricel SLU Compliance Audit – SLU Production
by Compliance Audits, from the Community
This Tricel SLU compliance audit checklist helps teams assess SLU production for GRP tank manufacturing. It covers mould preparation and maintenance, adherence to SOP064 for GRP and melamine processes, base and top coat gel checks (shelf life, contamination, thin patches, pinholes, runs), catalyst percentages and resin pressure, correct layup sequence, SLU quality defects (loose fibres, dry glass, air pockets), wet film gauge and skin thickness measurements (DW094), spray booth daily checks (TW196), required water testing duration and records (DW039), trimming quality, sign-offs, QA sticker application, and non-conformance quarantine and logging.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
