TIF Panel Production Compliance Audit Checklist
by Compliance Audits, from the Community
This compliance audit checklist supports TIF panel production at Tricel Weston. It guides auditors through CTQ checks across mould preparation, base and top coat gels, resin shelf life, catalyst pump increments, layup sequence and quality, trimming (voids and dry glass), drilling (jigs and hole alignment), and despatch. It also covers non-conformance rework, LPCB job card completion, final inspection log TW199, and quarantine recording, helping teams align with SOPs and maintain consistent product quality.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
