Use this pre-shipment HCI4 machine testing checklist to validate mechanical, electrical, and pneumatic readiness before crating. Inspect bolts and connectors, grease lines, cable management, and component labels. Test emergency stops and reset circuits, verify power supplies, set and check limit switches, and program servo drives. Confirm pendant behavior, check for air leaks, sync rams, and deploy the correct Arduino program, choosing 250 um or 500 um as required.
With SafetyCulture you can
With SafetyCulture you can
About author
This community page makes available free workplace checklists and templates created by other users within the SafetyCulture community. SafetyCulture has re-published this content and where possible, has credited the original author. SafetyCulture has not verified the accuracy, reliability or suitability of any community content. You agree that your use of any of this content is in accordance with SafetyCulture’s Terms and Conditions.
